Unforeseen Project Site Conditions Sample Clauses

Unforeseen Project Site Conditions. 5.3.1 Contractor shall immediately provide written notice to Owner apprising Owner of unforeseen conditions encountered, including:

Get the Official Word Add-in

Unforeseen Project Site Conditions. 5.2.1 If CM@Risk encounters, during the performance of its Work, concealed or latent physical conditions or subsurface conditions at the Project which (a) materially differ from the conditions indicated in the Contract Documents; or (b) are of an unusual nature which differ materially from the conditions ordinarily encountered and generally recognized as inherent in the sort of work provided for in the Contract Documents, CM@Risk shall immediately provide written notice to Owner apprising Owner of the unforeseen conditions encountered. CM@Risk shall not disturb or modify such conditions without Owner’s prior written consent. Owner shall promptly investigate CM@Risk’s notice of an unforeseen Site condition and advise CM@Risk of its findings and determination.

Unforeseen Project Site Conditions. 4.2.1 If Design-Builder encounters, during the performance of its Work, concealed or latent physical conditions or subsurface conditions at the Project which (i) materially differ from the conditions indicated in the Contract Documents; or (ii) are of an unusual nature which differ materially from the conditions ordinarily encountered and generally recognized as inherent in the Work provided hereunder, Design-Builder shall immediately provide written notice to Owner. Design-Builder shall not disturb or modify such conditions without Owner’s prior written consent. Owner shall promptly investigate Design-Builder’s claim of an un-contemplated site condition.

Unforeseen Project Site Conditions. In the event any conditions which are, or may be, protected under Applicable Law or Applicable Permits or any archeological resources or any other man-made or naturally occurring condition contained below the surface of an area which pertains to Contractor’s Work in which Contractor is permitted to dig pursuant to a dig permit issued in accordance with Part I, Section 7.3 of the Scope Book (other than the presence of Hazardous Materials which are addressed separately in Article 28), are found at the Project Site, the Shared Site Facilities or the Common Facilities that differ materially from those set forth in the Owner Provided Information regarding the Project Site (each such materially differing condition, an “Unforeseen Project Site Condition”), Contractor shall promptly notify Owner of such Unforeseen Project Site Condition and Owner and Contractor shall agree upon a plan to address or mitigate such condition. Notwithstanding anything to the contrary in the foregoing, in no event shall conditions at the Project Site arising after the date hereof resulting from ordinary operations as currently conducted at Units 1-4 or Alcoa’s aluminum smelter nearby the Project Site constitute an Unforeseen Project Site Condition; provided, however, that release or disposal of any Hazardous Materials on or at the Project Site in violation of Applicable Laws or permits related to such disposal by Alcoa or Owner’s Affiliate, as the case may be, shall not constitute “ordinary operations.” Any changes to the Work required to address or mitigate an Unforeseen Project Site Condition shall be deemed an Excusable Event and be subject to the provisions of Article 8.

Related to Unforeseen Project Site Conditions